Energy UNITS FOR DOUBLE-SCISSORS LIFT

Standard Description
Equipped with the zero leak bidirectional checking sole-noid valves, this power unit is developed to the operation of two independent circuits. Which are respectively for that primary and subordinate platforms of the double scissors lift. Two cut-off valves are utilized for decreasing the machine manually in situation of power loss. If additional independent circuits are needed for your application please make contact with us for availability.
Remark: 1. Please talk to our sales engineer for the different pump displacement, motor power or tank capability.
two. CSA or UL licensed motors are available on request.
Specific Notes
one. The AC motor is of S3 duty cycle, which can only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean each of the hydraulic parts concerned just before installation of the electrical power unit.
three. Viscosity in the oil shoud be 15~46 cst,as well as oil should really be clean and totally free of impurities,N46 hydraulic oil is suggested.
four. The power unit need to be mounted vertically.
five. Check the oil level within the tank soon after the initial operating of the energy unit.
six. Oil altering is needed after the original 100 operation hrs,afterwards when every 3000 hours.

Tags:

Recent Posts

Nm Coupling

As one of nm coupling manufacturers, suppliers and exporters of mechanical products, We offer nm coupling and many other products.

Please contact us for details.

Mail: [email protected]

Manufacturer supplier exporter of nm coupling.