The group is focused on generating all selection of standard roller chains and sprockets, gears & gearboxes, this sort of as conveyor chain & sprockets , stainless steel chain, agricultural chain and has not just marketed its goods all over china, but also sold a lot more than sixty five% items to oversees, like Europe, The usa, South-east Asia, and it also has set up storage logistics in places like Europe. Our business pays particular interest to customers’ wants, listening to the particular demands of every consumer and guaranteeing total fulfillment. our items are marketing effectively in the American, European, South American and Asian marketplaces. Model: DC-30A
Cost-free air shipping and delivery: 3.6m3/min
Operating pressure: 8bar
JCEP air finish rotor lobe: 5:six
Brand of screw air end: HanEPT EPTTiwan AB series with 6 pcs SKF bearings
EPTT: Mircro PLC controller
JCEPn: immediate coupling
Cooling: by air
JCEP motor: 30hp 22kW 380V/3PH/50HZ,IP54 defense degree
Discharge temperature: less than ambient eight ordmC
Sound: much less than 68 dB(A)
Air outlet measurement: G1 quot
Dimension: 1330*830*1265mm
Excess weight: 400kg
Warranty: 24 months for the screw air conclude,12 months for the EPTT established compressor apart from air filter,oil filter and oil/air separator.
Supply time: twenty five daEPTTafter obtaining deposit.
Benefits
Air finish
1.SAP sort line to maXiHu (West EPT) Dis.mize the screw compression effectiveness Equivalent merchandise save a lot more than five%
two.EPT machining precision, low vibration of principal EPTT and reduced noise
three.Achieved Nationwide Stage one JCEP Performance StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd.
EPT
1.Successful design and style, SKF bearings, make certain the EPTT existence of the motor.
two.IP54 protected entirely enclosed motor, fear-cost-free in severe circumstances run.
3.StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd phase sequence defense to prevent reversal.
Big Contact EPT EPTTler
one.Matching inverter exceptional customization.
two.Lcd EPTT and EPT switch show.
3.Abundant self-diagnostic capabilities such as fault alarm, upkeep rXiHu (West EPT) Dis.Hu (West EPT) Dis.der, automated shutdown, and so on.
four.Clock operate, can set timing switch.
five.Numerous sign outputs: RS485 port.
Inverter
one.ABB / EPT brand vector handle frequency conversion system, frequency conversion reaction speed is more quickly.
2.EPTT pressure output to take away force fluctuation and off-load.
3.EPTT temperature output at 9~85 degC, Low beginning existing to protect components,15% strength-preserving.
Pre-filter Security
1.Unique pre-filter go over design to maintain the inside of the EPTT cleanse and prolong the routine maintenance cycle.
2.EPT to disassemble and thoroughly clean, and can be reused.
Productive Cooling System
one.Adopting large-size higher-performance cooler to cope with harsh functioning circumstances.
two.Undertake independent huge supporter merged with oil cooling technique, reduce temperature and much more steady.
EPT Technique
1.StXiHu (West EPT) Dis.Hu (West EPT) Dis.rdized style, protected and reputable.
two.Professional wiring interface,the wiring is affordable, easy, clear and simple to sustain.,
three.SchneiEPTTand EPT are geared up with a collection of higher-degree elements, and their risk-free use is assured for a EPTT time.
Immediate JCEP
one.one: one direct EPT, secure and successful.
2.Adopts more experienced split-kind immediate EPT, which is more dependable and simpler to keep than built-in EPT.
3.EPTTorted brand name, large measurement coupling to guarantee the EPTT lifestyle of the EPT technique.
Adaptable
For some regions with inadequate working circumstances this sort of as higher temperature and substantial humidity,massive-area plate heat exchangers and high-performance air coolers are used.
Exhaust pipe
The exhaust pipe adopts double-layer EPTows,and the oil passage adopts EPTT temperature resistance of 125 degC large-force hose.
EPTnical Parameters:
Design | Discharge Force | Discharge Air Volume | EPT EPTT | Dimension(mm) | Discharge Pipc.Dia | Device Weight |
SEF350Z | .8MPa | ten.0m sup3/min | 55KW | 1900X1270X1570 | 1X2 quot | 1560KG |
one.0MPa | nine.0m sup3/min | |||||
one.3MPa | 7.8m sup3/min | |||||
SEF460Z | .8MPa | 13m sup3/min | 75KW | 1900X1270X1570 | 1X2 quot | 1731KG |
1.0MPa | eleven.8m sup3/min | |||||
1.3MPa | nine.6m sup3/min | |||||
SEF565Z | .8MPa | sixteen.0m sup3/min | 90KW | 2620X1670X1800 | 1X2 quot | 2260KG |
1.0MPa | 14.2m sup3/min | |||||
1.3MPa | 12.2m sup3/min | |||||
SEF710Z | .8MPa | 20.5m sup3/min | 110KW | 2620X1670X1800 | 1X2 quot | 2770KG |
one.0MPa | 17.8m sup3/min | |||||
1.3MPa | 15.5m sup3/min | |||||
SEF780Z | .8MPa | 23.5m sup3/min | 132KW | 2620x1670x1800 | 1×2 quot | 2926KG |
one.0MPa | twenty.5m sup3/min | |||||
one.3MPa | 17.0m sup3/min | |||||
SEF1060Z | .8MPa | thirty.0m sup3/min | 160KW | 3070X2140X2130 | DN80 | 4100KG |
one.0MPa | 26.0m sup3/min | |||||
1.3MPa | 22.0m sup3/min | |||||
SEF1165Z | .8MPa | 32.0m sup3/min | 185KW | 3070X2140X2130 | DN80 | 4400KG |
one.0MPa | 28.5m sup3/min | |||||
1.3MPa | twenty five.0m sup3/min | |||||
SEF1270Z | .8MPa | 35.0m sup3/min | 200KW | 3420X2220X2130 | DN100 | 5200KG |
1.0MPa | 31.0m sup3/min | |||||
one.3MPa | 27.0m sup3/min | |||||
SEF1420Z | .8MPa | 41.0m sup3/min | 250KW | 3420x2220X2130 | DN100 | 5300KG |
one.0MPa | 39.0m sup3/min | |||||
1.3MPa | 35.0m sup3/min | |||||
SEF1765Z | .8MPa | 50m sup3/min | 280KW | 4200X2380X2550 | DN125 | 5600KG |
one.0MPa | 42m sup3/min | |||||
SEF1980Z | .8MPa | 56m sup3/min | 315KW | 4200X2380X2550 | DN125 | 7980KG |
one.0MPa | 50m sup3/min | |||||
1.3MPa | 43m sup3/min | |||||
SEF2190ZW | .8MPa | 63m sup3/min | 355KW | 3690X2350X2150 | DN125 | 7350KG |
one.0MPa | 55m sup3/min | |||||
1.3MPa | 47m sup3/min | |||||
SEF2580ZW | .8MPa | 73m sup3/min | 400KW | 4070X2300X2250 | DN150 | 8100KG |
one.0MPa | 63m sup3/min | |||||
one.3MPa | 53m sup3/min | |||||
SEF2860ZW | .8MPa | 81m sup3/min | 450KW | 4070X2300X2250 | DN150 | 8500KG |
1.0MPa | 71m sup3/min | |||||
1.3MPa | 60m sup3/min | |||||
SEF3145ZW | .8MPa | 89m sup3/min | 500KW | 4300X2350X2150 | DN150 | 9000KG |
one.0MPa | 79m sup3/min | |||||
one.3MPa | 67m sup3/min | |||||
SEF3530ZW | .8MPa | 100m sup3/min | 560KW | 5000X2350X2150 | DN200 | 10000KG |
SEF3885ZW | .8MPa | 110m sup3/min | 630KW | 5000X2350X2150 | DN200 | 11000KG |
Item HIGHLIGEPTTS
1.The brand EPTT,trustworthy top quality, stable efficiency.
The harsh thermal equilibrium serviceability can guarantee that the EPTT perform properly unEPTThigh temperature setting ( le40 ordmC)
2.Exclusive patent design, ligEPTT load startup method
3.Effective cooling technique, divided into a few components: h2o- cooled ,mid- chilly, oil chilly, which guarantee the dependable operation of diesel motor, and it truly is suitable for substantial temperature doing work environment
four.Impartial study and deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ment of the reverse door design and style, rational format, which is easy to do normal maintenace ,with benefits of the fixed and transportable compressor
5.A one stage lifting, forklift gap gadget, equipped with drag ring.It is ideal for repair car transportation, effortless to transfer and installation of the unit
6.JCEPproof and dustproof style, which is appropriate for out of doors tough doing work atmosphere
7.EPTT, the heating EPT and distant components is offered for cold starting
Product Purposes:
EPTT and EPT
Our staff pack the examined air compressors in wooden instances. After the EPTT is accomplished, the air compressor will be transported to the port and then delivery to the planet.
Our EPTT
Our services
1.Pre-sale provider:
Act as a excellent adviser and assistant of clientele allow them to get rich and generous returns on their investments .
1.Choose tools model.
2.Style and manufacture goods in accordance to client’s EPTT requirement
3.Prepare complex staff for clientele .
2.Companies throughout the sale:
1.Pre-check and settle for items in advance of delivery .
two. Aid clients to draft solving ideas .
3.Soon after-sale companies:
Provide considerate companies to lessen clients’ anxieties.
one.Total Right after-income service,specialist engineers offered to provider EPTTry at home or oversea.
2. 24 several hours complex support by e-mail.
three.Other crucial technological services.
Get in touch with details: