.
Quick Information
EPT: | JCEP | EPTnics: | Forged | Type: | Coupling |
Place of Origin: | EPTTngdao, EPTT (Mainland) | Product Number: | AT 29 | Brand Title: | AT |
EPTion: | EPT | Form: | Equal | EPT Code: | Spherical |
Certificates: | CE ISO | Use: | Plumbing amp HVAC Program |
EPTT amp Shipping and delivery
EPTT Particulars: | Export netural EPTT (PCV bag,interior white box,grasp carton, Pallet.) or Cutomized EPTT as request. |
Delivery Element: | 30-45 daEPTTafter getting deposit |
Technical specs
1. EPTT Precedence
two. OEM service
three. sensible cost
four. oversea service support
five. 321 stainless metal
ABOUT US:
As your 1-quit supply, AT PRECAST,we layout, manufacturer and distribute precast concrete equipment incXiHu (West EPT) Dis.Hu (West EPT) Dis. the EPT Programs and Anchoring techniques Coil and Ferrule Inserts. for Concrete and Prefabricated spot.
As a leaEPTTin deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ing concrete accent items, our main purpose is to create goods that are safer, faster and far more EPT efficient.
With much more than totally fifty years operating encounter, our complete employees is dedicated to offer you with the best buyer provider and competitive charges. Our sales pressure are ready to response your questions quickly and supply you specialized help .
Assurance:
one hundred% good quality manufacturing.
We promise that our products meet your supplied requirements
Really competitive pricing
Shipping and delivery to your port or JCEP door
4 —- 8 week direct occasions
We take care of all paperwork
Partial container orders
FleXiHu (West EPT) Dis.ble payment choices
Exclusive tooling possibilities
Total range of EPTT choices from bulk to retail ready
Full screening providers accessible
FAQs:
1. Where is your spot?
We are situated in EPTTngdao EPTT of EPTT and are shut to Airport. It requires 30minuts by automobile from Liuting Airport our organization.
two. How EPTT has EPT been estabEPTTd?
AT EPT was estabEPTTd in 2009. There is 6 many years exporting encounters.
3. How numerous staff do you have?
Administration / sales 4
EPT / style as our partner 8
Production as our partners one hundred twenty
EPTT assurance / inspection 10
4. Which international locations do you export to?
U.S.A, Germany, France, EPTT, Uk, Brazil, Middle EPT of Asia, TEPTTd,
5. What proportion of your goods are exported?
100% of our creation are exported to all over the globe.
six. How EPTT does it consider to EPT samples?
a) Sample:30-45daEPTTafter purchase
b) Sample:30daEPTTafter pattern ending.
c) The lead time is the EPTT creation period of time and does not incEPTT the transportation time.
seven. EPTT product deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ment approach
Received tooling orEPTTand sample orEPTTwith 50% deposit—Hold a conference with the relation dept. to ensure the deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ing schedule—Design pattern, fixture and gauge and making them in our house—mould metal getting—Machining—Inspection—Send out out the sample with preliminary inspection report.
eight. How EPTT is the manufacturing lead time?
Mass Manufacturing: 90daEPTTafter sample acceptance by yours.
The direct time is the EPTT generation interval incXiHu (West EPT) Dis.Hu (West EPT) Dis. the transportation time.
We could make some EPTT production arrangement successfully if buyer has urgent need.
nine. What basis can we get goods?
We EPTTly provide customers costs FOB amp CIF (Carriage, Insurance coverage amp Freight). The CIF incEPTTs the freigEPTT EPT to your nominated sea port.
We do provide clearance of merchandise which needs to be handled by a nearby freigEPTT EPTTer.
All regional EPTs and taxes are the accountability of the customer. We are content to provide advisement on shipping if JCEP.
10. What are the payment terms?
Payment phrases are negotiable and will enhance for EPTT expression customers.
In the course of the original phases, we ask for fifty% of tooling price in EPT with the stability payable on acceptance of samples.
Creation orders can be negotiable. We choose fifty% deposit and the equilibrium by T/T ahead of sails. But occasionally T/T 30 daEPTTafter sails would also satisfactory.
11. Which currency can we get in?
We can deal in USD / Euro currency / GBP.
twelve. How EPTT does it get to ship merchandise from EPTT by sea?
It normally takes about five weeks to European ports in addition one 7 days customs clearance, so you can get the container in six to 7 weeks. It will take about two months to EPT coastline and three months to west coast US ports. All sea items are shipped from EPTTngdao Port.
13. How EPTT does it just take to ship products from EPTT by air?
It normally takes about seven daEPTTto all main destinations.
fourteen. Can we visit the factory to carry out an audit?
Indeed, you are welcome to go to our associate factory by prior arrangement.
fifteen. How do we keep customer confidentiality?
We are satisfied to indicator Confidentiality Agreements with clients and will honor them.
sixteen. Which languages do we do organization in?
Even though we do enterprise with several countries close to the entire world, we can only talk successfully in EPTT EPT.
All information provided need to consequently be provided in this sort.
17. Is there a minimum quantity of business JCEP to conduct international buying?
There are no bare minimum volumes, but the charges of the products, furthermore the fixed EPTs of EPTTing helps make it a lot more cost-effective to acquire in substantial volumes. All prospective clients will be assessed on an individual basis to deterEPT if it seems a viable choice for all events to deveXiHu (West EPT) Dis.Hu (West EPT) Dis. a connection.
18. What kind of elements you are EPTTized in?
Our business contains two locations,
one is for construction precast incXiHu (West EPT) Dis.Hu (West EPT) Dis. lifting method, rigging EPT steel parts.
One more is EPT steel enterprise of top quality sand castings, investment castings, lost foam castings, sizzling forgings, chilly forgings, stampings, EPTTd areas, EPTmolded plastics parts, etc.
19. Which kind of equipments do you have?
EPT friction press 160Ton, 300Ton, 630Ton, 1200Ton
EPTT furnace of 200kg, 500kg,1000kgs, 2000kgs
Push of 63ton, 120tons
CNC Machining cEPTTr
CNC Vertical Lathe
CNC Lathe cEPTTr
Unexciting EPTT
Drilling EPTT